Selected experience

Projects

Explore representative commercial, industrial, utility, and sports-lighting work.

Our work

Industrial Projects

Browse representative commercial, industrial, utility, and sports-lighting projects completed by Littleton Electric.

Industrial

In Progress

Advanced Storage

Piedmont, ALIndustrial manufacturing plant

Industrial

In Progress

Southwire Fire Alarm

Heflin, ALA major industrial wire and cable manufacturer.

Industrial

Building 363 Power Upgrade

Aniston Army Depot, AlabamaThis project consisted of the installation of a new 1000 KW pad mounted transformer, 3000 Amp Buss duct, 3000 Amp Main Distribution Panel, 750 KW Generator and a 225 KW UPS (Uninterrupted Power System). A concrete equipment pad and pre-engineered metal shed were installed to house the generator and pad mounted transformer. This project also required us to demo (6) pole mounted transformers, (3) pad mounted transformers, (1) 2000 Amp switchgear, (1) 1200 Amp switchgear and the existing UPS, all which was completed during a 48-hour shutdown.

Industrial

Generator Installation HPTC for Alabama Power Company

Verbana, AlabamaThis project consisted of the installation of a 150 KW Generator with sound rated enclosure, 600 Amp Service Disconnect, 600 Amp Automatic Transfer Switch and underground service feeders. This project also included installation of a 1,000 gallon propane tank and propane lines to fuel the generator. Equipment pads were installed for the generator set and propane tank with removable pipe bollards.

Industrial

Kronospan PB Plant - Low Voltage

Oxford, AlabamaInstallation of 9 - 4000KVA transformers, multiple primary distribution cabinets. Pull and terminate approximately 22,000 feet of Medium Voltage Cable.

Industrial

Kronospan PB Plant - Warehouse Addition

Oxford, Alabama176,000 square foot addition to the particle board plant. Including new distribution panels, lightning protection, light fixtures and welding stations.

Industrial

New Flyer VIC

Oxford, Alabama

Industrial

Restricted Area High Voltage Upgrade

Anniston Army Depot, AlabamaProject consisted of the installation of (6) 400 Amp, 12,470 Volt Hydraulic Re-closers with by-pass and isolation switches. This project also included the change-out of (85) 3-phase distribution poles, which were replaced with concrete poles.