Restricted Area High Voltage Upgrade
Location
Anniston Army Depot, AlabamaProject Description
Project consisted of the installation of (6) 400 Amp, 12,470 Volt Hydraulic Re-closers with by-pass and isolation switches. This project also included the change-out of (85) 3-phase distribution poles, which were replaced with concrete poles.